Hatta Hydropower Plant


Back

DEWA is developing a multi-billion dirham hydropower plant in Hatta, Dubai, the first for the region. The plant has a planned capacity of 250MW and the construction of the project will include deep-water tunnels, reservoirs, the main power station, as well as turbines for power generation. The output electricity will be connected to the main grid and is part of the Dubai Clean Energy Strategy 2050.

AESG was appointed to undertake the following:

  • Update of Environmental Impact Assessment
  • Authority Permitting
  • Construction Environmental Management Plan
  • Construction Auditing and Construction Supervision
  • Fire & Life Safety Consultancy
  • Client: N/A
  • Consultant:
  • Architect:
  • Developer: DEWA
  • Contractor:
  • Scope: Environmental Studies & Fire and Life Safety
  • Location: Hatta, Dubai, United Arab Emirates
  • Dates: 2019-ongoing
Hatta Hydropower Plant
Aerial view of an energy precinct with solar, battery and EV charging infrastructure

AESG acquires The Energy Project

We are excited to announce that AESG has acquired The Energy Project, strengthening our global renewable energy expertise.

Together we help asset owners navigate the energy transition and turn Net Zero targets into high-performance developments.