HSBC Tower development


Back

The new HSBC Tower development in Emaar Square, Dubai shall become the new consolidated UAE headquarters for HSBC. The building will consist of Grade A office space occupied by HSBC, along with some retail space on the ground floor to include an HSBC retail branch. The Project consists of 3 basement levels and 4 podium floors for parking with a further 14 levels of office space.

The project is targeting a LEED Gold rating.

AESG are providing the following services as part of the Project design and construction team:

  • LEED Gold consultancy
  • Dubai Green Building Regulations consultancy
  • Waste management consultancy
  • EIAS and CEMP Environmental consultancy (Environmental Clearance received)
  • Independent Commissioning Agent
  • Energy Modelling
HSBC Tower development
Aerial view of a motorway interchange surrounded by trees

AESG acquires Losee Consulting

We are excited to announce that AESG has acquired Losee Consulting, strengthening our infrastructure sustainability capabilities, adding deep expertise in sustainability ratings, climate resilience, embodied carbon reduction and independent assurance.